ENERGY AGENT · Demonstration prototype

Organise the initial proposal. Keep engineering judgement grounded in evidence.

For energy-equipment businesses and proposal engineers: a demonstration of requirements, rule-based selection, cost assumptions and proposal organisation for initial high-temperature heat pump solutions. AI assists with preparation; engineers retain final judgement.

01 · THE ENGINEERING CONTEXT

Start with complex requirements.
Identify what needs confirmation.

The value of assistance is to organise inputs, evidence and unknowns. Engineers must confirm actual operating conditions and equipment suitability; generated text is not a selection decision.

Scattered requirements

Customer descriptions, data sheets and historical notes need to be brought together and checked against their original sources.

Traceable evidence

Record the source and version of equipment parameters, selection rules and prices, rather than keeping only the conclusion.

Coordinated proposal work

Keep requirements, lists, costs and explanations consistent, with engineering review before external use.

02 · SEVEN CONNECTED STEPS

From requirements to a proposal,
keep the evidence with each step.

Seven connected stages make missing inputs visible rather than silently treating them as confirmed. Actual results still require review against the relevant rules and data.

  1. 01

    Requirements analysis

    Organise operating conditions, temperatures, heat load and customer goals, marking missing or conflicting information.

    Output at this step Structured requirements and unresolved questions
  2. 02

    Equipment selection

    Prepare candidates using applicable rules and equipment parameters, checking data versions and operating ranges.

    Output at this step Candidate equipment and selection rationale
  3. 03

    System description

    Organise system structure, interfaces and control explanations, recording the conditions under which the proposal applies.

    Output at this step System explanation and design assumptions
  4. 04

    Configuration list

    Check equipment, accessories, quantities and parameter sources, distinguishing confirmed items from unresolved ones.

    Output at this step A configuration list that can be checked
  5. 05

    Cost preparation

    Organise costs using confirmed prices, scope and assumptions. An example calculation is not a formal quotation.

    Output at this step Cost scope and price sources
  6. 06

    Economic analysis

    Identify inputs such as energy prices and operating hours, together with calculation boundaries and uncertainties.

    Output at this step Assumptions and analysis basis
  7. 07

    Proposal preparation

    Organise the initial proposal and supporting records. Engineers review it before deciding on external use.

    Output at this step Initial proposal and engineering-review records

03 · HUMAN REVIEW

What can assistance prepare,
and what must a person confirm?

Separate calculation, engineering judgement and written explanation so each part has a responsible owner.

AI supports understanding and explanation

Organise the original information, prepare explanations and identify questions.

AI must not confirm missing operating conditions or invent validated calculation results.

Rules and parameters provide the basis

Calculations and selection depend on rules, equipment parameters, price data and explicit assumptions.

Check versions, applicability and input sources. Example data is not a commitment for a real project.

Engineers make the final judgement

Confirm parameters, operating boundaries, suitability and the external explanation.

An initial proposal without engineering review is not a formal engineering design or an approved quotation.

Key review checks

Original requirements and parameter sources · Rule and equipment versions · Missing or conflicting inputs · Price and economic assumptions · Reviewer and proposal version

04 · EXPLORE THE FIT

Understand the workflow first,
then assess business fit.

Discuss the current proposal process, input requirements and review responsibilities before assessing rules, data and delivery scope together.

The public demonstration is not open

This is a demonstration prototype. It does not promise commercial availability, calculation accuracy, energy savings or delivery results. Approval, exports and enterprise messaging are shown only as prototype concepts.

Contact sales about demonstration arrangements. No external public demo link is provided before its public scope is approved.

The portal does not reproduce customer brands, screenshots, demo credentials or passwords.